Instruction to Bidders 
by Todd Ruff
 5/28/2010 7:04 PM
Please be sure to read all uploaded Instructions to Bidders / Project Requirements which have been uploaded to the project site.  This documentation is all considered part of the Contract Documents.
 
We have also uploaded the Mass Excavation CAD...
 

 Project Documents

Folder: Early MEP RFP
Early MEP RFPUse SHIFT+ENTER to open the menu (new window).
Folder: Site Logistics Info
Site Logistics InfoUse SHIFT+ENTER to open the menu (new window).
Folder: Bid Package 1 Bid Documents
Bid Package 1 Bid DocumentsUse SHIFT+ENTER to open the menu (new window).
Folder: Door Package
Door PackageUse SHIFT+ENTER to open the menu (new window).
Folder: Bid Package 1A - Elevators
Bid Package 1A - ElevatorsUse SHIFT+ENTER to open the menu (new window).
Folder: Bid Package 2 - Interim Maternal Fetal Medicine
Bid Package 2 - Interim Maternal Fetal MedicineUse SHIFT+ENTER to open the menu (new window).
Folder: Bid Package 1C - Separation Walls
Bid Package 1C - Separation WallsUse SHIFT+ENTER to open the menu (new window).
 
 
Red Picture

 Submit Pre-Bid RFI

Click to submit
Click here to submit RFI

 Project Calendar

< September, 2010 >
 Sun  Mon  Tue  Wed  Thu  Fri  Sat 
 29 
 30 
 31 
 1 
 2 
 3 
 4 
 5 
 6 
 7 
 8 
 9 
 10 
 11 
 12 
 13 
 14 
 15 
 16 
 17 
 18 
 19 
 20 
 21 
 22 
 23 
 24 
 25 
 26 
 27 
 28 
 29 
 30 
 1 
 2 

 Links

There are currently no favorite links to display.